news center
Production News Express
2024-01-10 views 195
On the morning of January 10, the "MAERSK REDWOOD", a 3,500TEU container ship built and delivered by our group's New Yangzi Shipbuilding for the shipowner Japan's LEPTA Company, unmoored and set sail from the shipyard dock and was put into operation of the MAERSK fleet.
"MAERSK REDWOOD" has a total length of 200 meters, a molded width of 36.4 meters, and a molded depth of 20.6 meters. It is classified into the ABS classification society. The ship was delivered via electronic signature. At about 10 a.m. on January 10, representatives from the shipowner, construction supervision team, ship inspection and shipyard gathered at the New Yangzi Shipbuilding Terminal to bid farewell to the maiden voyage.
2024.09.24
Delivery and Departure of the Tenth LNG Dual Fuel 7000TEU Co…
2024.09.14
The first batch of 40,000 CBM Dual-Fuel LPG/ Ammonia Carrier…
2024.09.11
Delivery and Departure of the Fourth 1260TEU Methanol Dual F…
2024.09.02
Project Conclusion| Delivery and Departure of the Ninth 1600…
2024.08.29
Delivery and Departure of 66,000DWT Wide-Beam Bulk Carrier …
2024.08.23
Delivery and Departure of 40000 DWT Bulk Carrier "APPIA" bui…
2024.08.22
Delivery and Departure of the Third 1260TEU Methanol Dual Fu…
2024.08.21
Delivery and Departure of 66,000DWT Wide-Beam Bulk Carrier "…
2024.08.06
Delivery and Departure of the Ninth LNG Dual Fuel 7000TEU Co…
2024.07.25
The 52000DWT Bulk Carrier "Huayuan 505" of Yangzijiang Shipp…